RGD served as the prime consultant for this complex, multi-phase project, delivering full MEP, fire protection, and structural engineering services for an 8,500 SF administration building with associated site infrastructure upgrades. As prime, RGD coordinated architectural, civil, and landscape disciplines to ensure seamless integration and efficient project delivery.
The scope included demolition and site infrastructure design, detailed engineering specifications for lighting, power distribution, fire alarm, plumbing, and low-voltage systems—all fully compliant with NFPA, ADA, and Florida Building Code standards. Additionally, RGD performed short circuit calculations, coordination studies, and a complete Arc Flash Analysis, resulting in a safe, efficient, and resilient facility that meets the district’s operational needs and anticipates future demands.